docs(20-02): create summary and update state for frontend subscriptions

Phase 20 (Real-Time Subscriptions) is now complete. Both plans delivered:
- 20-01: SSE backend with subscription procedures
- 20-02: Frontend splitLink + subscription hooks on all 3 UI pages
This commit is contained in:
Lukas May
2026-02-04 22:22:53 +01:00
parent 170ac55afd
commit 48c81f70a8
2 changed files with 123 additions and 7 deletions

View File

@@ -9,19 +9,19 @@ See: .planning/PROJECT.md (updated 2026-02-04)
## Current Position
Phase: 20 of 21 (Real-Time Subscriptions) - IN PROGRESS
Plan: 1 of 2 in current phase
Status: Completed 20-01 (SSE Streaming & Subscription Procedures)
Last activity: 2026-02-04 - Completed 20-01-PLAN.md (SSE backend)
Phase: 20 of 21 (Real-Time Subscriptions) - COMPLETE
Plan: 2 of 2 in current phase (all complete)
Status: Completed 20-02 (Frontend SSE Subscription Hooks)
Last activity: 2026-02-04 - Completed 20-02-PLAN.md (frontend subscriptions)
Progress: █████████░ 99%
## Performance Metrics
**Velocity:**
- Total plans completed: 71
- Total plans completed: 72
- Average duration: 3 min
- Total execution time: 201 min
- Total execution time: 204 min
**By Phase (v1.0):**
@@ -229,6 +229,10 @@ Recent decisions affecting current work:
- 20-01: tracked() wrapper on each event for client-side reconnection via lastEventId
- 20-01: Fallback AbortSignal (new AbortController().signal) when opts.signal is undefined
- 20-01: Vite proxy works for SSE without changes (http-proxy streams chunked responses by default)
- 20-02: httpSubscriptionLink (stable export) over unstable_ prefix — both available in @trpc/client v11
- 20-02: Subscription-driven invalidation (not local state) — simplest approach, reuses existing React Query cache
- 20-02: Silent onError callbacks — pages degrade to manual refresh when backend is not running
- 20-02: No new packages needed — splitLink and httpSubscriptionLink ship with @trpc/client v11
### Pending Todos
@@ -251,5 +255,5 @@ None.
## Session Continuity
Last session: 2026-02-04
Stopped at: Completed 20-01 (SSE Streaming & Subscription Procedures)
Stopped at: Completed 20-02 (Frontend SSE Subscription Hooks) — Phase 20 complete
Resume file: None