chore: complete v1.3 milestone

- Added MILESTONES.md entry
- Evolved PROJECT.md with validated requirements
- Created milestone archive: milestones/v1.3-ROADMAP.md
- Updated STATE.md
- Tagged v1.3
This commit is contained in:
Lukas May
2026-02-04 16:46:20 +01:00
parent 1156933a8e
commit 98fb3477b0
4 changed files with 138 additions and 13 deletions

View File

@@ -1,5 +1,33 @@
# Project Milestones: Codewalk District
## v1.3 Parallel Execution & UI Design (Shipped: 2026-02-02)
**Delivered:** Parallel phase execution with dependency tracking and frontend UI wireframes for initiative dashboard, detail view, and agent inbox.
**Phases completed:** 14-15 (11 plans total)
**Key accomplishments:**
- Phase dependency system mirroring task dependencies for concurrent execution
- PhaseDispatchManager with in-memory queue and dependency-ordered dispatch
- E2E tests proving independent, sequential, diamond, and blocked phase scenarios
- Initiative dashboard wireframe with status badges, progress bars, architect spawn actions
- Initiative detail wireframe with Phase → Task hierarchy and dependency visualization
- Agent inbox wireframe with multi-question Q&A and answer submission flow
**Stats:**
- 34 files created/modified
- ~29,900 lines of TypeScript total
- 2 phases, 11 plans
- 1 day from start to ship
**Git range:** `feat(14-01)``fix(15-02)`
**What's next:** Frontend implementation, file system UI, production hardening
---
## v1.2 Architect & Multi-Question (Shipped: 2026-02-02)
**Delivered:** Structured planning workflow with Architect agent modes and efficient multi-question Q&A with batched answers.

View File

@@ -23,11 +23,14 @@ If everything else fails, this must work: spawn agents, assign work, know what's
-**Multi-question Q&A** — batched questions with id-based answer correlation, efficient agent pauses — v1.2
-**Architect agent modes** — discuss, breakdown, decompose for structured planning workflow — v1.2
-**Real CLI validation** — integration tests confirming Claude CLI JSON schema handling — v1.2
-**Parallel phase execution** — phase dependencies with concurrent dispatch of independent phases — v1.3
-**Frontend wireframes** — initiative dashboard, detail view, and agent inbox UI designs — v1.3
### Active
- [ ] **File system UI (fsui)** — bidirectional sync between SQLite and filesystem; agent messages appear as files, user responds by editing files
- [ ] **Production hardening** — error handling, logging improvements, graceful degradation
- [ ] **Frontend implementation** — build React UI from wireframe specifications
### Out of Scope
@@ -39,13 +42,14 @@ If everything else fails, this must work: spawn agents, assign work, know what's
## Current State
**Shipped:** v1.2 Architect & Multi-Question (2026-02-02)
**Shipped:** v1.3 Parallel Execution & UI Design (2026-02-02)
- Full orchestration system: CLI, database, git worktrees, agent lifecycle, dispatch, coordination
- Parallel phase execution with dependency-ordered dispatch
- 40+ E2E tests with MockAgentManager proving all scenarios work
- Architect agent with discuss/breakdown/decompose modes for planning
- Multi-question Q&A with batched answers
- Real Claude CLI integration tests validating schema handling
- ~27,600 LOC TypeScript across 150+ files
- Frontend wireframes for 3 core screens (dashboard, detail, inbox)
- ~29,900 LOC TypeScript across 160+ files
**Tech stack:** TypeScript, tRPC, SQLite/Drizzle, Vitest, Hexagonal architecture
@@ -83,6 +87,8 @@ If everything else fails, this must work: spawn agents, assign work, know what's
| SQLite over distributed Git (beads) | All agents share same workspace, no need for distributed sync | — Pending |
| TypeScript over Go | tRPC ecosystem, user preference, reference impl in Go is for learning not porting | — Pending |
| Terminal inbox via fsui, not TUI | Less code, leverage existing editor, bidirectional fs sync already planned | — Pending |
| Phase deps mirror task deps | Same FK patterns, cascade delete, in-memory queue — consistency over novelty | ✓ Good |
| Remove Plan layer from UI | Simplified hierarchy to Initiative → Phase → Task; plans are internal concept | ✓ Good |
---
*Last updated: 2026-02-02 after v1.2 milestone*
*Last updated: 2026-02-04 after v1.3 milestone*

View File

@@ -2,19 +2,19 @@
## Project Reference
See: .planning/PROJECT.md (updated 2026-02-02)
See: .planning/PROJECT.md (updated 2026-02-04)
**Core value:** Coordinate multiple Claude Code agents without losing track or stepping on each other.
**Current focus:** v1.3 complete, ready for next milestone
**Current focus:** Planning next milestone
## Current Position
Phase: 15 of 15 (Frontend Wireframes) ✓
Plan: All complete
Status: Milestone v1.3 complete
Last activity: 2026-02-02Phase 15 complete, v1.3 shipped
Phase: All milestones complete (v1.0-v1.3)
Plan: None active
Status: Ready for next milestone
Last activity: 2026-02-04v1.3 milestone archived
Progress: ██████████ 100%
Progress: ██████████ 100% (61 plans across 15 phases)
## Performance Metrics
@@ -198,6 +198,6 @@ None.
## Session Continuity
Last session: 2026-02-02
Stopped at: Milestone v1.3 complete (61 plans total)
Last session: 2026-02-04
Stopped at: v1.3 archived, ready for next milestone
Resume file: None

View File

@@ -0,0 +1,91 @@
# Milestone v1.3: Parallel Execution & UI Design
**Status:** SHIPPED 2026-02-02
**Phases:** 14-15
**Total Plans:** 11
## Overview
Enable parallel phase execution with dependency tracking and design the frontend UI with markdown wireframes. Phases can now declare dependencies on other phases and execute concurrently when independent. Three UI screens designed as ASCII wireframes with component specifications.
## Phases
### Phase 14: Parallel Phase Execution
**Goal**: Add dependencies to phases (same pattern as tasks), enable concurrent execution of independent phases
**Depends on**: Phase 13 (v1.2 complete)
**Plans**: 8 plans
Plans:
- [x] 14-01: Phase Dependencies Schema & Repository
- [x] 14-02: Phase Domain Events
- [x] 14-03: PhaseDispatchManager Port Interface
- [x] 14-04: PhaseDispatchManager Adapter
- [x] 14-05: tRPC Procedures
- [x] 14-06: CLI Commands
- [x] 14-07: Unit Tests
- [x] 14-08: E2E Tests
**Key deliverables:**
- phase_dependencies table mirroring task_dependencies pattern
- Phase lifecycle events (queued, started, completed, blocked)
- PhaseDispatchManager port and DefaultPhaseDispatchManager adapter
- Dependency-ordered phase dispatch with in-memory queue
- tRPC procedures for phase dependencies and dispatch
- CLI commands under `cw phase` group
- E2E tests covering independent, sequential, diamond, and blocked scenarios
**Key decisions:**
- 14-01: phase_dependencies table mirrors task_dependencies exactly (same FK patterns, cascade delete)
- 14-02: Phase events follow task event naming pattern (phase:queued, phase:started, etc.)
- 14-03: PhaseDispatchManager methods use Phase suffix for clarity
- 14-04: In-memory Map for phaseQueue (same pattern as DefaultDispatchManager)
- 14-04: Sort ready phases by queuedAt (oldest first, no priority)
- 14-06: Phase commands as top-level `cw phase` group
- 14-08: E2E tests cover 4 core scenarios: independent, sequential, diamond, blocked
### Phase 15: Frontend Wireframes
**Goal**: Markdown diagrams for initiative dashboard, phase/task breakdown, and agent inbox UI screens
**Depends on**: Phase 14
**Plans**: 3 plans
Plans:
- [x] 15-01: Initiative Dashboard Wireframe
- [x] 15-02: Initiative Detail Wireframe
- [x] 15-03: Agent Inbox Wireframe
**Key deliverables:**
- Initiative dashboard with status badges, progress bars, architect spawn actions
- Initiative detail with Phase → Task hierarchy, dependency visualization, agent assignments
- Agent inbox with multi-question Q&A, option groups, answer submission flow
- Component specifications for all UI elements (14 components total)
- Interaction notes for navigation, modals, and keyboard shortcuts
**Key decisions:**
- Simplified UI hierarchy to Initiative → Phase → Task (removed Plan layer)
- PhaseAccordion contains tasks directly (no intermediate PlanTree)
- Progress metrics show phases/tasks only (no plans count)
---
## Milestone Summary
**Key Decisions:**
- Phase dependency pattern mirrors task dependency exactly for consistency
- In-memory queues for phase dispatch (same as task dispatch, no persistence for v1)
- Removed Plan layer from UI hierarchy — simplified to Initiative → Phase → Task
- Phase commands as top-level CLI group for direct access
**Issues Resolved:**
- None
**Issues Deferred:**
- None
**Technical Debt Incurred:**
- None
---
_For current project status, see .planning/ROADMAP.md_