docs(19-04): create inbox page assembly summary and update state
Phase 19 (Agent Inbox) complete. All 4 plans executed: backend API procedures, InboxList/MessageCard components, QuestionForm/input components, and inbox page assembly with tRPC wiring.
This commit is contained in:
@@ -9,19 +9,19 @@ See: .planning/PROJECT.md (updated 2026-02-04)
|
|||||||
|
|
||||||
## Current Position
|
## Current Position
|
||||||
|
|
||||||
Phase: 19 of 21 (Agent Inbox) - IN PROGRESS
|
Phase: 19 of 21 (Agent Inbox) - COMPLETE
|
||||||
Plan: 3 of 4 in current phase
|
Plan: 4 of 4 in current phase
|
||||||
Status: Plan 19-03 complete
|
Status: Phase 19 complete
|
||||||
Last activity: 2026-02-04 - Completed 19-03-PLAN.md (QuestionForm & Input Components)
|
Last activity: 2026-02-04 - Completed 19-04-PLAN.md (Inbox Page Assembly)
|
||||||
|
|
||||||
Progress: █████████░ 98%
|
Progress: █████████░ 98%
|
||||||
|
|
||||||
## Performance Metrics
|
## Performance Metrics
|
||||||
|
|
||||||
**Velocity:**
|
**Velocity:**
|
||||||
- Total plans completed: 69
|
- Total plans completed: 70
|
||||||
- Average duration: 3 min
|
- Average duration: 3 min
|
||||||
- Total execution time: 195 min
|
- Total execution time: 197 min
|
||||||
|
|
||||||
**By Phase (v1.0):**
|
**By Phase (v1.0):**
|
||||||
|
|
||||||
@@ -222,6 +222,9 @@ Recent decisions affecting current work:
|
|||||||
- 19-03: OptionGroup value is always string (comma-joined for multi-select) for consistent interface
|
- 19-03: OptionGroup value is always string (comma-joined for multi-select) for consistent interface
|
||||||
- 19-03: QuestionForm owns answer state internally via useState (self-contained component)
|
- 19-03: QuestionForm owns answer state internally via useState (self-contained component)
|
||||||
- 19-03: allowOther defaults to true per plan spec
|
- 19-03: allowOther defaults to true per plan spec
|
||||||
|
- 19-04: Detail panel inline in page file (not a separate component) — page-specific layout
|
||||||
|
- 19-04: useUtils() for query invalidation on mutation success (same pattern as initiative detail)
|
||||||
|
- 19-04: Serialize agent/message data to string dates for InboxList props (wire format consistency)
|
||||||
|
|
||||||
### Pending Todos
|
### Pending Todos
|
||||||
|
|
||||||
@@ -244,5 +247,5 @@ None.
|
|||||||
## Session Continuity
|
## Session Continuity
|
||||||
|
|
||||||
Last session: 2026-02-04
|
Last session: 2026-02-04
|
||||||
Stopped at: Completed 19-03 (QuestionForm & Input Components)
|
Stopped at: Completed 19-04 (Inbox Page Assembly) — Phase 19 complete
|
||||||
Resume file: None
|
Resume file: None
|
||||||
|
|||||||
96
.planning/phases/19-agent-inbox/19-04-SUMMARY.md
Normal file
96
.planning/phases/19-agent-inbox/19-04-SUMMARY.md
Normal file
@@ -0,0 +1,96 @@
|
|||||||
|
---
|
||||||
|
phase: 19-agent-inbox
|
||||||
|
plan: 04
|
||||||
|
subsystem: ui
|
||||||
|
tags: [react, trpc, tanstack-query, tailwind, inbox, agent-questions]
|
||||||
|
|
||||||
|
# Dependency graph
|
||||||
|
requires:
|
||||||
|
- phase: 19-agent-inbox
|
||||||
|
provides: InboxList, MessageCard, QuestionForm, OptionGroup, FreeTextInput components and tRPC procedures (getAgentQuestions, listWaitingAgents)
|
||||||
|
- phase: 18-initiative-detail
|
||||||
|
provides: Query management patterns, mutation/invalidation flow, loading/error state patterns
|
||||||
|
provides:
|
||||||
|
- Fully functional Agent Inbox page at /inbox route
|
||||||
|
- Answer submission flow (QuestionForm → resumeAgent mutation → query invalidation)
|
||||||
|
- Notification dismissal flow (respondToMessage mutation)
|
||||||
|
- Two-column responsive layout with detail panel
|
||||||
|
affects: [21-polish-integration]
|
||||||
|
|
||||||
|
# Tech tracking
|
||||||
|
tech-stack:
|
||||||
|
added: []
|
||||||
|
patterns: ["Two-column inbox layout with list + detail panel", "Conditional query enabling via selectedAgentId"]
|
||||||
|
|
||||||
|
key-files:
|
||||||
|
created: []
|
||||||
|
modified:
|
||||||
|
- packages/web/src/routes/inbox.tsx
|
||||||
|
|
||||||
|
key-decisions:
|
||||||
|
- "Detail panel is inline in page file (not a separate component) — page-specific layout"
|
||||||
|
- "useUtils() for query invalidation on mutation success (same pattern as initiative detail)"
|
||||||
|
- "Serialize agent/message data to string dates for InboxList props (wire format consistency)"
|
||||||
|
|
||||||
|
patterns-established:
|
||||||
|
- "Conditional tRPC query: enabled: !!selectedId pattern for detail-on-select"
|
||||||
|
- "Mutation → invalidate → clear selection flow for submit/dismiss actions"
|
||||||
|
|
||||||
|
# Metrics
|
||||||
|
duration: 2min
|
||||||
|
completed: 2026-02-04
|
||||||
|
---
|
||||||
|
|
||||||
|
# Phase 19 Plan 04: Inbox Page Assembly Summary
|
||||||
|
|
||||||
|
**Agent Inbox page wired with tRPC data fetching, two-column layout (InboxList + detail panel), answer submission via resumeAgent, and notification dismissal via respondToMessage**
|
||||||
|
|
||||||
|
## Performance
|
||||||
|
|
||||||
|
- **Duration:** 2 min
|
||||||
|
- **Started:** 2026-02-04
|
||||||
|
- **Completed:** 2026-02-04
|
||||||
|
- **Tasks:** 2
|
||||||
|
- **Files modified:** 1
|
||||||
|
|
||||||
|
## Accomplishments
|
||||||
|
- Replaced stub inbox page with full implementation connecting all Phase 19 components
|
||||||
|
- Wired InboxList with listWaitingAgents and listMessages tRPC queries
|
||||||
|
- Detail panel shows agent header, structured QuestionForm, or notification content based on selection
|
||||||
|
- Answer submission calls resumeAgent mutation and refreshes data on success
|
||||||
|
- Notification messages can be dismissed via respondToMessage mutation
|
||||||
|
- Loading and error states handled following initiative detail page patterns
|
||||||
|
|
||||||
|
## Task Commits
|
||||||
|
|
||||||
|
Each task was committed atomically:
|
||||||
|
|
||||||
|
1. **Task 1: Wire inbox page with data fetching, detail panel, and answer submission** - `3cac453` (feat)
|
||||||
|
2. **Task 2: Full build verification and integration check** - No code changes needed (all checks pass)
|
||||||
|
|
||||||
|
## Files Created/Modified
|
||||||
|
- `packages/web/src/routes/inbox.tsx` - Full inbox page with tRPC queries, mutations, InboxList, QuestionForm, detail panel, loading/error states
|
||||||
|
|
||||||
|
## Decisions Made
|
||||||
|
- Detail panel implemented inline in the page file (not a separate component) since it's page-specific layout
|
||||||
|
- useUtils() for query invalidation on mutation success, following the same pattern used in initiative detail page
|
||||||
|
- Agent/message data serialized to string dates before passing to InboxList (wire format consistency with other components)
|
||||||
|
|
||||||
|
## Deviations from Plan
|
||||||
|
|
||||||
|
None - plan executed exactly as written.
|
||||||
|
|
||||||
|
## Issues Encountered
|
||||||
|
None
|
||||||
|
|
||||||
|
## User Setup Required
|
||||||
|
None - no external service configuration required.
|
||||||
|
|
||||||
|
## Next Phase Readiness
|
||||||
|
- Phase 19 (Agent Inbox) is complete — all 4 plans executed
|
||||||
|
- Inbox page fully functional with list view, detail panel, question answering, and notification dismissal
|
||||||
|
- Ready for Phase 20+ (polish and integration)
|
||||||
|
|
||||||
|
---
|
||||||
|
*Phase: 19-agent-inbox*
|
||||||
|