docs(01.1-01): complete event bus foundation plan

Tasks completed: 3/3
- Install and configure Vitest test framework
- Create EventBus port interface and EventEmitter adapter
- Define domain events with typed payloads and tests

SUMMARY: .planning/phases/01.1-hexagonal-architecture/01.1-01-SUMMARY.md
This commit is contained in:
Lukas May
2026-01-30 13:56:20 +01:00
parent 437e76ed78
commit e72ffdd800
3 changed files with 121 additions and 10 deletions

View File

@@ -10,27 +10,28 @@ See: .planning/PROJECT.md (updated 2026-01-30)
## Current Position
Phase: 1.1 of 8 (Hexagonal Architecture - INSERTED)
Plan: 0 of 6 in current phase
Status: Planned (6 plans in 3 waves)
Last activity: 2026-01-30 — Planned Phase 1.1
Plan: 1 of 6 in current phase
Status: In progress
Last activity: 2026-01-30 — Completed 01.1-01-PLAN.md
Progress: ██████████ 71%
Progress: ██████████ 73%
## Performance Metrics
**Velocity:**
- Total plans completed: 5
- Total plans completed: 6
- Average duration: 3 min
- Total execution time: 15 min
- Total execution time: 18 min
**By Phase:**
| Phase | Plans | Total | Avg/Plan |
|-------|-------|-------|----------|
| 1 | 5/5 | 15 min | 3 min |
| 1.1 | 1/6 | 3 min | 3 min |
**Recent Trend:**
- Last 5 plans: 01-01 (2 min), 01-02 (1 min), 01-03 (0 min), 01-04 (5 min), 01-05 (7 min)
- Last 5 plans: 01-02 (1 min), 01-03 (0 min), 01-04 (5 min), 01-05 (7 min), 01.1-01 (3 min)
- Trend: Steady
## Accumulated Context
@@ -44,6 +45,7 @@ Recent decisions affecting current work:
- 01-02: Task 2 required no code changes - existing bin config was correct
- 01-04: Log directory structure ~/.cw/logs/{processId}/ with timestamp prefixes
- 01-05: Used node:http instead of Express for minimal server footprint
- 01.1-01: EventBus is PORT, EventEmitterBus is ADAPTER for swappability
### Pending Todos
@@ -62,5 +64,5 @@ None yet.
## Session Continuity
Last session: 2026-01-30
Stopped at: Completed 01-05-PLAN.md (Phase 1 complete)
Stopped at: Completed 01.1-01-PLAN.md (Event Bus Foundation)
Resume file: None