approveInitiative was merging and pushing with a stale local
defaultBranch, causing "rejected (fetch first)" when origin/main
had advanced since the last project sync. Now fetches remote and
fast-forwards the target branch before merging.
Pre-merge mergeability check via `git merge-tree --write-tree` (dry-run, no
side effects). When conflicts exist the "Merge & Push" button is disabled and
a ConflictResolutionPanel shows conflict files with options to resolve manually
or spawn a conflict-resolution agent. Agent questions appear inline via
QuestionForm; on completion the mergeability re-checks automatically.
New server-side: MergeabilityResult type, BranchManager.checkMergeability,
conflict-resolution prompt, checkInitiativeMergeability query,
spawnConflictResolutionAgent mutation, getActiveConflictAgent query.
New frontend: useConflictAgent hook, ConflictResolutionPanel component,
mergeability badge + panel integration in InitiativeReview.
handleTaskCompleted and handlePhaseAllTasksDone both bailed early when
initiative had no branch, silently skipping phase status transitions.
Also, merge failures would skip the phase completion check entirely.
- Decouple phase completion check from branch existence
- Wrap merge in try/catch so phase check runs even if merge fails
- Route updateTaskStatus through dispatchManager.completeTask when
completing, so the task:completed event fires for orchestration
Critical: review/merge tasks hit an early return in handleTaskCompleted()
that skipped the phase completion check, leaving phases stuck in
in_progress forever. Changed to an if-block wrapping only the merge step.
Also adds requestChangesOnInitiative() which creates/reuses a
"Finalization" phase for initiative-level review feedback, with dedup
guards for both phase and initiative request-changes flows.
Completed phases showed "No phases pending review" because:
1. Frontend filtered only pending_review phases
2. Server rejected non-pending_review phases
3. After merge, three-dot diff returned empty (merge base moved)
Fix: store pre-merge merge base hash on phase, use it to reconstruct
diffs for completed phases. Frontend now shows both pending_review and
completed phases with read-only mode (Merged badge) for completed ones.
Both phaseQueue and taskQueue are in-memory Maps lost on restart. Now
the orchestrator's start() method scans active initiatives and:
- Re-queues approved phases into the phase dispatch queue
- Re-queues pending tasks for in_progress phases into the task dispatch queue
- Triggers a dispatch cycle if anything was recovered
This fixes stuck phases/tasks after server restarts.
The in-memory phaseQueue (Map) in DefaultPhaseDispatchManager is lost on
server restart. After approving a phase review, dispatchNextPhase() found
nothing in the empty queue, so the next unblocked phase never started.
Now the orchestrator re-queues all approved phases for the initiative from
the DB before attempting to dispatch, making the queue self-healing.
When all phases complete, the initiative now transitions to
pending_review status instead of silently stopping. The user
reviews the full initiative diff and chooses:
- Push Branch: push cw/<name> to remote for PR workflows
- Merge & Push: merge into default branch and push
Changes:
- Schema: Add pending_review to initiative status enum
- BranchManager: Add pushBranch port + SimpleGit adapter
- Events: initiative:pending_review, initiative:review_approved
- Orchestrator: checkInitiativeCompletion + approveInitiative
- tRPC: getInitiativeReviewDiff, getInitiativeReviewCommits,
getInitiativeCommitDiff, approveInitiativeReview
- Frontend: InitiativeReview component in ReviewTab
- Subscriptions: Add initiative events + missing preview/conversation
event types and subscription procedures
- Add PhaseChangesRequestedEvent to event bus
- Add requestChangesOnPhase() to ExecutionOrchestrator: reads unresolved
comments, creates revision task (category='review'), resets phase to
in_progress, queues task for dispatch
- Expand merge-skip and branch routing to include 'review' category so
revision tasks work directly on the phase branch
- Add requestPhaseChanges tRPC procedure (reads comments from DB)
- Wire frontend: mutation replaces stub handler, window.prompt for
optional summary, loading state on button
The orchestrator's agent:stopped listener only called scheduleDispatch(),
never marking the agent's assigned task as completed. Tasks stayed
in_progress forever after their agent finished.
Now handleAgentStopped() calls dispatchManager.completeTask() before
scheduling new dispatches, respecting requiresApproval and skipping
manual (user_requested) stops.
ExecutionOrchestrator now listens for phase:queued and agent:stopped
events to drive the dispatch cycle, closing the gap between queueing
phases (Execute button) and actually spawning agents. Coalesced
scheduling prevents reentrancy with synchronous EventEmitter.
Move src/ → apps/server/ and packages/web/ → apps/web/ to adopt
standard monorepo conventions (apps/ for runnable apps, packages/
for reusable libraries). Update all config files, shared package
imports, test fixtures, and documentation to reflect new paths.
Key fixes:
- Update workspace config to ["apps/*", "packages/*"]
- Update tsconfig.json rootDir/include for apps/server/
- Add apps/web/** to vitest exclude list
- Update drizzle.config.ts schema path
- Fix ensure-schema.ts migration path detection (3 levels up in dev,
2 levels up in dist)
- Fix tests/integration/cli-server.test.ts import paths
- Update packages/shared imports to apps/server/ paths
- Update all docs/ files with new paths