Roadmap: Codewalkers

Overview

Multi-agent orchestration system built in six phases: foundation infrastructure, then data persistence, then git worktrees for isolation, then agent lifecycle management, then task dispatch and queuing, and finally coordination/merge handling. Each phase delivers a coherent capability that later phases depend on.

Domain Expertise

None

Milestones

  • v1.0 Core System - Phases 1-6 (shipped 2026-01-30)
  • v1.1 Test Infrastructure - Phases 7-9 (shipped 2026-01-31)
  • v1.2 Architect & Multi-Question - Phases 10-13 (shipped 2026-02-02)
  • v1.3 Parallel Execution & UI Design - Phases 14-15 (shipped 2026-02-02)
  • v2.0 Frontend - Phases 16-21 (shipped 2026-02-05)

Phases

Phase Numbering:

  • Integer phases (1, 2, 3): Planned milestone work
  • Decimal phases (2.1, 2.2): Urgent insertions (marked with INSERTED)
v1.0 Core System (Phases 1-6) - SHIPPED 2026-01-30

Phase 1: Core Infrastructure

Goal: CLI binary (cw) with server mode, process management, graceful shutdown, and logging Depends on: Nothing (first phase) Requirements: INFRA-01, INFRA-02, INFRA-03, INFRA-04, INFRA-05 Research: Unlikely (Node.js process patterns well-documented) Plans: 5 plans

Plans:

  • 01-01: Project Foundation
  • 01-02: CLI Entry Point
  • 01-03: Process Management
  • 01-04: Logging Infrastructure
  • 01-05: Coordination Server & Shutdown

Phase 1.1: Hexagonal Architecture (INSERTED)

Goal: Retrofit Phase 1 with hexagonal architecture, event-based inter-module communication, unit/integration tests, and tRPC for client communication Depends on: Phase 1 Requirements: None (architectural refactor) Research: Unlikely (patterns well-documented) Plans: 6 plans

Plans:

  • 01.1-01: Event Bus Foundation
  • 01.1-02: tRPC Foundation
  • 01.1-03: Process Module Tests + Events
  • 01.1-04: Logging Module Tests + Events
  • 01.1-05: Server Module Tests + Events
  • 01.1-06: CLI tRPC Integration

Phase 2: Data Layer

Goal: SQLite database with Drizzle ORM, task hierarchy schema (initiative → phase → plan → task) Depends on: Phase 1 Requirements: TASK-02, TASK-03 Research: Unlikely (Drizzle/SQLite well-documented) Plans: 2 plans

Plans:

  • 02-01: SQLite Database Setup
  • 02-02: Repository Layer

Phase 3: Git Integration

Goal: Git worktree management — create isolated worktrees per agent, preview diffs, integrate changes, cleanup Depends on: Phase 2 Requirements: GIT-01, GIT-02, GIT-03, GIT-04 Research: Unlikely (Git worktree well-documented) Plans: 2 plans

Plans:

  • 03-01: Git Events & WorktreeManager Port
  • 03-02: WorktreeManager Adapter

Phase 4: Agent Lifecycle

Goal: Spawn, stop, list Claude Code agents with session persistence and background mode Depends on: Phase 3 Requirements: AGENT-01, AGENT-02, AGENT-03, AGENT-04, AGENT-05, AGENT-07 Research: Likely (MCP protocol / Claude Code CLI integration needs validation) Research topics: Claude Code CLI -p flag behavior, JSON output schema, STDIO MCP transport, process tree management with execa Plans: 4 plans

Plans:

  • 04-01: Agent Schema & Repository
  • 04-02: AgentManager Port & Events
  • 04-03: AgentManager Adapter
  • 04-04: tRPC Integration & CLI Commands

Phase 5: Task Dispatch

Goal: Task status visibility, dependency-ordered dispatch, work queue, agent message queue Depends on: Phase 4 Requirements: AGENT-06, TASK-01, TASK-04, TASK-05 Research: Unlikely (standard queue patterns) Plans: 5 plans

Plans:

  • 05-01: Message Schema & Repository
  • 05-02: Task tRPC & CLI
  • 05-03: Dispatch Port & Events
  • 05-04: Dispatch Adapter
  • 05-05: Message & Dispatch CLI

Phase 6: Coordination

Goal: Merge agent outputs into integration branch in dependency order, bounce conflicts back to agents Depends on: Phase 5 Requirements: COORD-01, COORD-02 Research: Unlikely (programmatic coordination) Plans: 3 plans

Plans:

  • 06-01: Coordination Events & Port
  • 06-02: CoordinationManager Adapter
  • 06-03: tRPC & CLI Integration
v1.1 Test Infrastructure (Phases 7-9) - SHIPPED 2026-01-31

Milestone Goal: E2E test coverage with mocked agents proving all dispatch/coordination scenarios work end-to-end

Full details: milestones/v1.1-ROADMAP.md

Phase 7: Mock Agent & Test Harness

  • 07-01: MockAgentManager Adapter
  • 07-02: Test Harness with Database Fixtures

Phase 8: E2E Scenario Tests

  • 08-01: Happy Path E2E Tests
  • 08-02: Edge Case E2E Tests

Phase 8.1: Agent Output Schema (INSERTED)

  • 08.1-01: Agent Output Schema & ClaudeAgentManager
  • 08.1-02: MockAgentManager Schema Alignment

Phase 9: Extended Scenarios

  • 09-01: Conflict & Parallel E2E Tests
  • 09-02: Recovery & Resume E2E Tests
v1.2 Architect & Multi-Question (Phases 10-13) - SHIPPED 2026-02-02

Milestone Goal: Enable structured planning workflow with Architect agent and efficient multi-question Q&A

Full details: milestones/v1.2-ROADMAP.md

Full details: milestones/v1.2-ROADMAP.md

Phase 10: Multi-Question Schema

Goal: Extend agent output schema to return multiple questions; resume agent with all answers batched Depends on: Phase 9 (v1.1 complete) Research: Unlikely (extends existing schema patterns) Plans: 4

Plans:

  • 10-01: Schema & Type Updates
  • 10-02: Manager Implementation
  • 10-03: TestHarness & Test Updates
  • 10-04: E2E Test Updates

Phase 11: Architect Agent

Goal: Agent modes for concept refinement (questioning) and phase breakdown (persisting to ROADMAP.md) Depends on: Phase 10 Research: Unlikely (internal workflow patterns) Plans: 8

Plans:

  • 11-01: Agent Mode Schema Extension
  • 11-02: Initiative & Phase Repositories
  • 11-03: ClaudeAgentManager Mode Support
  • 11-04: Initiative & Phase tRPC Procedures
  • 11-05: Architect Spawn Procedures
  • 11-06: CLI Commands
  • 11-07: Unit Tests
  • 11-08: E2E Tests

Phase 12: Phase-Task Decomposition

Goal: Agents break phases into individual tasks with ability to ask questions during breakdown Depends on: Phase 11 Research: Unlikely (internal coordination patterns) Plans: 8

Plans:

  • 12-01: Decompose Mode Schema
  • 12-02: PlanRepository Extensions
  • 12-03: ClaudeAgentManager Decompose Support
  • 12-04: Plan & Task tRPC Procedures
  • 12-05: Decompose Prompts & Spawn Procedure
  • 12-06: CLI Commands
  • 12-07: Unit Tests
  • 12-08: E2E Tests

Phase 13: Real Claude E2E Tests

Goal: Verify multi-question and architect flows with actual Claude CLI; replace with mocks after verification Depends on: Phase 12 Research: Likely (validating Claude CLI --json-schema with multi-question arrays) Research topics: Claude CLI behavior with array-typed questions, response parsing, error handling for real agent failures Plans: 1

Plans:

  • 13-01: Real Claude CLI Integration Tests
v1.3 Parallel Execution & UI Design (Phases 14-15) - SHIPPED 2026-02-02

Milestone Goal: Enable parallel phase execution and design the frontend UI with markdown wireframes

Phase 14: Parallel Phase Execution

Goal: Add dependencies to phases (same pattern as tasks), enable concurrent execution of independent phases Depends on: Phase 13 (v1.2 complete) Research: Unlikely (extends existing task dependency patterns) Plans: 8

Plans:

  • 14-01: Phase Dependencies Schema & Repository
  • 14-02: Phase Domain Events
  • 14-03: PhaseDispatchManager Port Interface
  • 14-04: PhaseDispatchManager Adapter
  • 14-05: tRPC Procedures
  • 14-06: CLI Commands
  • 14-07: Unit Tests
  • 14-08: E2E Tests

Phase 15: Frontend Wireframes

Goal: Markdown diagrams for initiative dashboard, phase/task breakdown, and agent inbox UI screens Depends on: Phase 14 Research: Unlikely (markdown documentation) Plans: 3

Plans:

  • 15-01: Initiative Dashboard Wireframe
  • 15-02: Initiative Detail Wireframe
  • 15-03: Agent Inbox Wireframe

v2.0 Frontend (SHIPPED 2026-02-05)

Milestone Goal: Build the web UI from v1.3 wireframes using React + Vite with real-time tRPC subscriptions

Phase 16: Frontend Scaffold

Goal: Vite project setup, tRPC client wiring, router, shared type exports, shadcn/ui config Depends on: Phase 15 (v1.3 complete) Research: Likely (new tech stack setup) Research topics: Vite monorepo setup, @trpc/react-query client configuration, shadcn/ui installation Plans: 5 plans

Plans:

  • 16-01: Vite + React + Tailwind + shadcn/ui
  • 16-02: Shared Types Package
  • 16-03: tRPC Client Wiring
  • 16-04: React Router Setup
  • 16-05: Dev Server Integration

Phase 17: Initiative Dashboard

Goal: List view with status badges, progress bars, filtering, architect spawn dropdown Depends on: Phase 16 Research: Unlikely (internal patterns, components from wireframes) Plans: 4 plans

Plans:

  • 17-01: StatusBadge & ProgressBar Components
  • 17-02: InitiativeCard & InitiativeList Components
  • 17-03: Interactive Dialog & Dropdown Components
  • 17-04: Dashboard Page Assembly

Phase 18: Initiative Detail

Goal: Phase/task hierarchy accordion, dependency indicators, agent assignments, queue actions Depends on: Phase 17 Research: Unlikely (internal patterns, components from wireframes) Plans: 4 plans

Plans:

  • 18-01: InitiativeHeader & ProgressPanel Components
  • 18-02: PhaseAccordion, TaskRow & DependencyIndicator Components
  • 18-03: DecisionList & TaskDetailModal Components
  • 18-04: Initiative Detail Page Assembly

Phase 19: Agent Inbox

Goal: Message list, multi-question forms (radio/checkbox/free-text), answer submission, notifications Depends on: Phase 18 Research: Unlikely (internal patterns, form handling from wireframes) Plans: 4 plans

Plans:

  • 19-01: Backend API for Agent Questions
  • 19-02: InboxList & MessageCard Components
  • 19-03: QuestionForm & Input Components
  • 19-04: Inbox Page Assembly

Phase 20: Real-time Subscriptions

Goal: SSE streaming on tRPC server, subscription hooks, live status updates Depends on: Phase 19 Research: Likely (tRPC SSE subscriptions) Research topics: tRPC v11 async generator subscriptions, SSE streaming, httpSubscriptionLink Plans: 2 plans

Plans:

  • 20-01: SSE Streaming & Subscription Procedures
  • 20-02: Frontend SSE Subscription Hooks

Phase 21: Polish & Integration

Goal: Cross-screen navigation, error states, loading states, responsive layout, integration testing Depends on: Phase 20 Research: Unlikely (polish and integration of existing screens) Plans: 6 plans

Plans:

  • 21-01: Error Boundary & Toast Notifications
  • 21-02: Skeleton Loading States
  • 21-03: Cross-Screen Navigation & Mobile Responsive
  • 21-04: Subscription Error Handling
  • 21-05: Code Splitting & Performance
  • 21-06: Integration Smoke Test

Progress

Execution Order: Phases execute in numeric order: 1 → 1.1 → 2 → 3 → 4 → 5 → 6 → 7 → 8 → 8.1 → 9 → 10 → 11 → 12 → 13 → 14 → 15 → 16 → 17 → 18 → 19 → 20 → 21

Phase Milestone Plans Complete Status Completed
1. Core Infrastructure v1.0 5/5 Complete 2026-01-30
1.1. Hexagonal Architecture v1.0 6/6 Complete 2026-01-30
2. Data Layer v1.0 2/2 Complete 2026-01-30
3. Git Integration v1.0 2/2 Complete 2026-01-30
4. Agent Lifecycle v1.0 4/4 Complete 2026-01-30
5. Task Dispatch v1.0 5/5 Complete 2026-01-30
6. Coordination v1.0 3/3 Complete 2026-01-30
7. Mock Agent & Test Harness v1.1 2/2 Complete 2026-01-31
8. E2E Scenario Tests v1.1 2/2 Complete 2026-01-31
8.1. Agent Output Schema v1.1 2/2 Complete 2026-01-31
9. Extended Scenarios v1.1 2/2 Complete 2026-01-31
10. Multi-Question Schema v1.2 4/4 Complete 2026-01-31
11. Architect Agent v1.2 8/8 Complete 2026-01-31
12. Phase-Task Decomposition v1.2 8/8 Complete 2026-02-01
13. Real Claude E2E Tests v1.2 1/1 Complete 2026-02-02
14. Parallel Phase Execution v1.3 8/8 Complete 2026-02-02
15. Frontend Wireframes v1.3 3/3 Complete 2026-02-02
16. Frontend Scaffold v2.0 5/5 Complete 2026-02-04
17. Initiative Dashboard v2.0 4/4 Complete 2026-02-04
18. Initiative Detail v2.0 4/4 Complete 2026-02-04
19. Agent Inbox v2.0 4/4 Complete 2026-02-04
20. Real-time Subscriptions v2.0 2/2 Complete 2026-02-04
21. Polish & Integration v2.0 6/6 Complete 2026-02-05

Roadmap created: 2026-01-30 v1.0 shipped: 2026-01-30 (27 plans, 6 phases) v1.1 shipped: 2026-01-31 (8 plans, 3 phases) v1.2 shipped: 2026-02-02 (21 plans, 4 phases) v1.3 shipped: 2026-02-02 (11 plans, 2 phases) v2.0 shipped: 2026-02-05 (27 plans, 6 phases)