Files
Codewalkers/.planning/phases/18-initiative-detail/18-03-SUMMARY.md

1.8 KiB

Plan 18-03 Summary

Result: COMPLETE

Tasks: 2/2 completed Duration: ~3 min

What was built

DecisionList component

  • Collapsible list of key decisions in a Card with "Key Decisions" header
  • Each decision individually expandable with ChevronDown/ChevronRight indicators
  • Internal state tracks expanded indices via Set<number>
  • Show more/less button when decisions exceed maxVisible (default 3)
  • Empty state placeholder: "No decisions recorded"
  • File: packages/web/src/components/DecisionList.tsx

TaskDetailModal component

  • Controlled Dialog (open when task !== null) following CreateInitiativeDialog pattern
  • Metadata grid: Status (StatusBadge), Priority, Phase, Type, Agent
  • Description section with fallback to "No description"
  • Dependencies section listing dependency names with status badges
  • Blocks section listing dependent names with status badges
  • Queue Task button: enabled only when status is 'pending' and all dependencies completed
  • Stop Task button: enabled only when status is 'in_progress'
  • SerializedTask interface for tRPC Date-to-string wire format
  • File: packages/web/src/components/TaskDetailModal.tsx

Decisions

  • 18-03: SerializedTask type mirrors SerializedInitiative pattern (Date fields become string over JSON)
  • 18-03: Both components are purely presentational with callback props (no tRPC calls inside)

Commits

  • 3baba49: feat(18-03): create DecisionList component for initiative detail
  • 5b17b7a: feat(18-03): create TaskDetailModal component for initiative detail

Verification

  • npx tsc --noEmit -p packages/web/tsconfig.app.json passes
  • npx vite build in packages/web succeeds
  • Both components export correctly
  • Dialog follows controlled pattern matching CreateInitiativeDialog