Files
Codewalkers/.planning/STATE.md
Lukas May 63e603709d docs(01.1-05): complete server tests and events plan
Tasks completed: 2/2
- Write unit tests for CoordinationServer
- Add event emission to server and shutdown handler

SUMMARY: .planning/phases/01.1-hexagonal-architecture/01.1-05-SUMMARY.md
2026-01-30 14:04:47 +01:00

2.0 KiB

Project State

Project Reference

See: .planning/PROJECT.md (updated 2026-01-30)

Core value: Coordinate multiple Claude Code agents without losing track or stepping on each other. Current focus: Phase 1.1 — Hexagonal Architecture (INSERTED)

Current Position

Phase: 1.1 of 8 (Hexagonal Architecture - INSERTED) Plan: 5 of 6 in current phase Status: In progress Last activity: 2026-01-30 — Completed 01.1-05-PLAN.md

Progress: █████████████░ 92%

Performance Metrics

Velocity:

  • Total plans completed: 8
  • Average duration: 3 min
  • Total execution time: 26 min

By Phase:

Phase Plans Total Avg/Plan
1 5/5 15 min 3 min
1.1 3/6 11 min 4 min

Recent Trend:

  • Last 5 plans: 01-04 (5 min), 01-05 (7 min), 01.1-01 (3 min), 01.1-02 (6 min), 01.1-05 (2 min)
  • Trend: Steady

Accumulated Context

Decisions

Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work:

  • 01-01: Merged Tasks 1 and 2 since build verification required source files
  • 01-02: Task 2 required no code changes - existing bin config was correct
  • 01-04: Log directory structure ~/.cw/logs/{processId}/ with timestamp prefixes
  • 01-05: Used node:http instead of Express for minimal server footprint
  • 01.1-01: EventBus is PORT, EventEmitterBus is ADAPTER for swappability
  • 01.1-02: Zod for output validation, procedures match HTTP endpoint shapes
  • 01.1-04: EventBus is optional parameter for backwards compatibility in logging
  • 01.1-05: Optional eventBus injection for server lifecycle events

Pending Todos

None yet.

Roadmap Evolution

  • Phase 1.1 inserted after Phase 1: Hexagonal architecture with events, tests, and tRPC (URGENT)
    • Retrofits Phase 1 code before continuing to Phase 2
    • Establishes architectural foundation for rest of project

Blockers/Concerns

None yet.

Session Continuity

Last session: 2026-01-30 Stopped at: Completed 01.1-05-PLAN.md (Server Tests and Events) Resume file: None