- 6 plans in 3 waves documented - Wave structure: parallel foundation → parallel refactors → integration - Ready for execution
1.7 KiB
1.7 KiB
Project State
Project Reference
See: .planning/PROJECT.md (updated 2026-01-30)
Core value: Coordinate multiple Claude Code agents without losing track or stepping on each other. Current focus: Phase 1.1 — Hexagonal Architecture (INSERTED)
Current Position
Phase: 1.1 of 8 (Hexagonal Architecture - INSERTED) Plan: 0 of 6 in current phase Status: Planned (6 plans in 3 waves) Last activity: 2026-01-30 — Planned Phase 1.1
Progress: ██████████ 71%
Performance Metrics
Velocity:
- Total plans completed: 5
- Average duration: 3 min
- Total execution time: 15 min
By Phase:
| Phase | Plans | Total | Avg/Plan |
|---|---|---|---|
| 1 | 5/5 | 15 min | 3 min |
Recent Trend:
- Last 5 plans: 01-01 (2 min), 01-02 (1 min), 01-03 (0 min), 01-04 (5 min), 01-05 (7 min)
- Trend: Steady
Accumulated Context
Decisions
Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work:
- 01-01: Merged Tasks 1 and 2 since build verification required source files
- 01-02: Task 2 required no code changes - existing bin config was correct
- 01-04: Log directory structure ~/.cw/logs/{processId}/ with timestamp prefixes
- 01-05: Used node:http instead of Express for minimal server footprint
Pending Todos
None yet.
Roadmap Evolution
- Phase 1.1 inserted after Phase 1: Hexagonal architecture with events, tests, and tRPC (URGENT)
- Retrofits Phase 1 code before continuing to Phase 2
- Establishes architectural foundation for rest of project
Blockers/Concerns
None yet.
Session Continuity
Last session: 2026-01-30 Stopped at: Completed 01-05-PLAN.md (Phase 1 complete) Resume file: None