Tasks completed: 2/2 - Add tRPC HTTP adapter and CLI client - Update CLI status command and add integration tests SUMMARY: .planning/phases/01.1-hexagonal-architecture/01.1-06-SUMMARY.md Phase 1.1 complete: 131 tests, hexagonal architecture retrofitted
2.2 KiB
2.2 KiB
Project State
Project Reference
See: .planning/PROJECT.md (updated 2026-01-30)
Core value: Coordinate multiple Claude Code agents without losing track or stepping on each other. Current focus: Phase 1.1 — Hexagonal Architecture (INSERTED)
Current Position
Phase: 1.1 of 8 (Hexagonal Architecture - INSERTED) Plan: 6 of 6 in current phase Status: Phase complete Last activity: 2026-01-30 — Completed 01.1-06-PLAN.md
Progress: ██████████████ 100%
Performance Metrics
Velocity:
- Total plans completed: 9
- Average duration: 3 min
- Total execution time: 30 min
By Phase:
| Phase | Plans | Total | Avg/Plan |
|---|---|---|---|
| 1 | 5/5 | 15 min | 3 min |
| 1.1 | 4/6 | 15 min | 4 min |
Recent Trend:
- Last 5 plans: 01-05 (7 min), 01.1-01 (3 min), 01.1-02 (6 min), 01.1-05 (2 min), 01.1-06 (4 min)
- Trend: Steady
Accumulated Context
Decisions
Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work:
- 01-01: Merged Tasks 1 and 2 since build verification required source files
- 01-02: Task 2 required no code changes - existing bin config was correct
- 01-04: Log directory structure ~/.cw/logs/{processId}/ with timestamp prefixes
- 01-05: Used node:http instead of Express for minimal server footprint
- 01.1-01: EventBus is PORT, EventEmitterBus is ADAPTER for swappability
- 01.1-02: Zod for output validation, procedures match HTTP endpoint shapes
- 01.1-03: Optional eventBus parameter for ProcessManager, events emitted synchronously
- 01.1-04: EventBus is optional parameter for backwards compatibility in logging
- 01.1-05: Optional eventBus injection for server lifecycle events
- 01.1-06: Use @trpc/server/adapters/fetch for HTTP handling, keep HTTP endpoints for curl
Pending Todos
None yet.
Roadmap Evolution
- Phase 1.1 inserted after Phase 1: Hexagonal architecture with events, tests, and tRPC (URGENT)
- Retrofits Phase 1 code before continuing to Phase 2
- Establishes architectural foundation for rest of project
Blockers/Concerns
None yet.
Session Continuity
Last session: 2026-01-30 Stopped at: Completed 01.1-06-PLAN.md (CLI-tRPC Integration) - Phase 1.1 complete Resume file: None