Roadmap: Codewalk District
Overview
Multi-agent orchestration system built in six phases: foundation infrastructure, then data persistence, then git worktrees for isolation, then agent lifecycle management, then task dispatch and queuing, and finally coordination/merge handling. Each phase delivers a coherent capability that later phases depend on.
Domain Expertise
None
Milestones
- ✅ v1.0 Core System - Phases 1-6 (shipped 2026-01-30)
- ✅ v1.1 Test Infrastructure - Phases 7-9 (shipped 2026-01-31)
Phases
Phase Numbering:
- Integer phases (1, 2, 3): Planned milestone work
- Decimal phases (2.1, 2.2): Urgent insertions (marked with INSERTED)
✅ v1.0 Core System (Phases 1-6) - SHIPPED 2026-01-30
Phase 1: Core Infrastructure
Goal: CLI binary (cw) with server mode, process management, graceful shutdown, and logging
Depends on: Nothing (first phase)
Requirements: INFRA-01, INFRA-02, INFRA-03, INFRA-04, INFRA-05
Research: Unlikely (Node.js process patterns well-documented)
Plans: 5 plans
Plans:
- 01-01: Project Foundation
- 01-02: CLI Entry Point
- 01-03: Process Management
- 01-04: Logging Infrastructure
- 01-05: Coordination Server & Shutdown
Phase 1.1: Hexagonal Architecture (INSERTED)
Goal: Retrofit Phase 1 with hexagonal architecture, event-based inter-module communication, unit/integration tests, and tRPC for client communication Depends on: Phase 1 Requirements: None (architectural refactor) Research: Unlikely (patterns well-documented) Plans: 6 plans
Plans:
- 01.1-01: Event Bus Foundation
- 01.1-02: tRPC Foundation
- 01.1-03: Process Module Tests + Events
- 01.1-04: Logging Module Tests + Events
- 01.1-05: Server Module Tests + Events
- 01.1-06: CLI tRPC Integration
Phase 2: Data Layer
Goal: SQLite database with Drizzle ORM, task hierarchy schema (initiative → phase → plan → task) Depends on: Phase 1 Requirements: TASK-02, TASK-03 Research: Unlikely (Drizzle/SQLite well-documented) Plans: 2 plans
Plans:
- 02-01: SQLite Database Setup
- 02-02: Repository Layer
Phase 3: Git Integration
Goal: Git worktree management — create isolated worktrees per agent, preview diffs, integrate changes, cleanup Depends on: Phase 2 Requirements: GIT-01, GIT-02, GIT-03, GIT-04 Research: Unlikely (Git worktree well-documented) Plans: 2 plans
Plans:
- 03-01: Git Events & WorktreeManager Port
- 03-02: WorktreeManager Adapter
Phase 4: Agent Lifecycle
Goal: Spawn, stop, list Claude Code agents with session persistence and background mode Depends on: Phase 3 Requirements: AGENT-01, AGENT-02, AGENT-03, AGENT-04, AGENT-05, AGENT-07 Research: Likely (MCP protocol / Claude Code CLI integration needs validation) Research topics: Claude Code CLI -p flag behavior, JSON output schema, STDIO MCP transport, process tree management with execa Plans: 4 plans
Plans:
- 04-01: Agent Schema & Repository
- 04-02: AgentManager Port & Events
- 04-03: AgentManager Adapter
- 04-04: tRPC Integration & CLI Commands
Phase 5: Task Dispatch
Goal: Task status visibility, dependency-ordered dispatch, work queue, agent message queue Depends on: Phase 4 Requirements: AGENT-06, TASK-01, TASK-04, TASK-05 Research: Unlikely (standard queue patterns) Plans: 5 plans
Plans:
- 05-01: Message Schema & Repository
- 05-02: Task tRPC & CLI
- 05-03: Dispatch Port & Events
- 05-04: Dispatch Adapter
- 05-05: Message & Dispatch CLI
Phase 6: Coordination
Goal: Merge agent outputs into integration branch in dependency order, bounce conflicts back to agents Depends on: Phase 5 Requirements: COORD-01, COORD-02 Research: Unlikely (programmatic coordination) Plans: 3 plans
Plans:
- 06-01: Coordination Events & Port
- 06-02: CoordinationManager Adapter
- 06-03: tRPC & CLI Integration
✅ v1.1 Test Infrastructure (Shipped 2026-01-31)
Milestone Goal: E2E test coverage with mocked agents proving all dispatch/coordination scenarios work end-to-end
Phase 7: Mock Agent & Test Harness
Goal: Mock agent adapter with configurable scenarios + test harness foundation with DB-seeded fixtures Depends on: v1.0 complete Research: Unlikely (internal test patterns, vitest already in codebase) Plans: TBD
Plans:
- 07-01: MockAgentManager Adapter
- 07-02: Test Harness with Database Fixtures
Phase 8: E2E Scenario Tests
Goal: Happy path tests (basic flow, dependencies, merging) + edge case tests (conflicts, interrupts, token limits) Depends on: Phase 7 Research: Unlikely (testing existing functionality) Plans: 2 plans
Plans:
- 08-01: Happy Path E2E Tests
- 08-02: Edge Case E2E Tests
Phase 8.1: Agent Output Schema (INSERTED)
Goal: Define structured agent output schema (done/question/error discriminated union) and update ClaudeAgentManager to use --json-schema flag for validated output parsing
Depends on: Phase 8
Research: Unlikely (Zod schemas, Claude CLI flags documented)
Plans: 2 plans
Plans:
- 08.1-01: Agent Output Schema & ClaudeAgentManager
- 08.1-02: MockAgentManager Schema Alignment
Phase 9: Extended Scenarios
Goal: Extended E2E scenario coverage — conflict hand-back round-trip, multi-agent parallel work, recovery/resume flows Depends on: Phase 8.1 Research: Unlikely (testing existing functionality) Plans: 2 plans
Plans:
- 09-01: Conflict & Parallel E2E Tests
- 09-02: Recovery & Resume E2E Tests
Progress
Execution Order: Phases execute in numeric order: 1 → 1.1 → 2 → 3 → 4 → 5 → 6 → 7 → 8 → 8.1 → 9
| Phase | Milestone | Plans Complete | Status | Completed |
|---|---|---|---|---|
| 1. Core Infrastructure | v1.0 | 5/5 | Complete | 2026-01-30 |
| 1.1. Hexagonal Architecture | v1.0 | 6/6 | Complete | 2026-01-30 |
| 2. Data Layer | v1.0 | 2/2 | Complete | 2026-01-30 |
| 3. Git Integration | v1.0 | 2/2 | Complete | 2026-01-30 |
| 4. Agent Lifecycle | v1.0 | 4/4 | Complete | 2026-01-30 |
| 5. Task Dispatch | v1.0 | 5/5 | Complete | 2026-01-30 |
| 6. Coordination | v1.0 | 3/3 | Complete | 2026-01-30 |
| 7. Mock Agent & Test Harness | v1.1 | 2/2 | Complete | 2026-01-31 |
| 8. E2E Scenario Tests | v1.1 | 2/2 | Complete | 2026-01-31 |
| 8.1. Agent Output Schema | v1.1 | 2/2 | Complete | 2026-01-31 |
| 9. Extended Scenarios | v1.1 | 2/2 | Complete | 2026-01-31 |
Roadmap created: 2026-01-30 v1.0 shipped: 2026-01-30 (27 plans, 6 phases) v1.1 shipped: 2026-01-31 (8 plans, 3 phases)