docs(21-06): complete integration smoke test plan

Tasks completed: 2/2
- Run full build verification (TypeScript, Vite, tests)
- Full integration smoke test (human-verified, approved)

SUMMARY: .planning/phases/21-polish-integration/21-06-SUMMARY.md
This commit is contained in:
Lukas May
2026-02-05 09:16:31 +01:00
parent 51c26d6d19
commit 111ed0962f
3 changed files with 107 additions and 15 deletions

View File

@@ -0,0 +1,90 @@
---
phase: 21-polish-integration
plan: 06
subsystem: ui
tags: [integration-test, smoke-test, verification, frontend]
# Dependency graph
requires:
- phase: 21-04
provides: Subscription error handling with toast notifications
- phase: 21-05
provides: Code splitting, PlanTasksFetcher render fix
provides:
- Verified frontend ready to ship as v2.0
- Full build pipeline confirmed (TypeScript, Vite, tests)
- Human-verified all screens, navigation, error handling, and loading states
affects: []
# Tech tracking
tech-stack:
added: []
patterns: []
key-files:
created: []
modified: []
key-decisions:
- "No code changes needed — verification-only plan confirming all Phase 21 work integrates correctly"
patterns-established: []
# Metrics
duration: 2min
completed: 2026-02-05
---
# Phase 21 Plan 06: Integration Smoke Test Summary
**Full build pipeline and human-verified end-to-end smoke test confirming v2.0 frontend readiness**
## Performance
- **Duration:** 2 min
- **Started:** 2026-02-05
- **Completed:** 2026-02-05
- **Tasks:** 2
- **Files modified:** 0
## Accomplishments
- Full build verification passed: TypeScript (backend + frontend), Vite production build, all tests green
- No `console.error` calls remaining in component source files
- Human smoke test approved: dashboard, detail, inbox, error handling, 404, loading states, and navigation all verified end-to-end
## Task Commits
This was a verification-only plan with no code changes:
1. **Task 1: Run full build verification** - (no commit - verification only)
2. **Task 2: Full integration smoke test** - (no commit - human-verify checkpoint, approved)
**Plan metadata:** committed with SUMMARY + STATE + ROADMAP update
## Files Created/Modified
None - verification-only plan.
## Decisions Made
None - followed plan as specified. All prior Phase 21 work verified as correct.
## Deviations from Plan
None - plan executed exactly as written.
## Issues Encountered
None
## User Setup Required
None - no external service configuration required.
## Next Phase Readiness
- Phase 21 complete. All 6 plans finished.
- v2.0 Frontend milestone ready to ship.
- All screens verified: dashboard, initiative detail, agent inbox, 404
- Error handling confirmed: toast notifications, persistent SSE disconnect warning, graceful degradation
- Loading states confirmed: skeleton loading cards, rows, and layout
- Navigation confirmed: cross-screen links, mobile responsive drill-down, back buttons
---
*Phase: 21-polish-integration*
*Completed: 2026-02-05*