docs(21-06): complete integration smoke test plan
Tasks completed: 2/2 - Run full build verification (TypeScript, Vite, tests) - Full integration smoke test (human-verified, approved) SUMMARY: .planning/phases/21-polish-integration/21-06-SUMMARY.md
This commit is contained in:
@@ -14,7 +14,7 @@ None
|
|||||||
- ✅ **v1.1 Test Infrastructure** - Phases 7-9 (shipped 2026-01-31)
|
- ✅ **v1.1 Test Infrastructure** - Phases 7-9 (shipped 2026-01-31)
|
||||||
- ✅ **v1.2 Architect & Multi-Question** - Phases 10-13 (shipped 2026-02-02)
|
- ✅ **v1.2 Architect & Multi-Question** - Phases 10-13 (shipped 2026-02-02)
|
||||||
- ✅ **v1.3 Parallel Execution & UI Design** - Phases 14-15 (shipped 2026-02-02)
|
- ✅ **v1.3 Parallel Execution & UI Design** - Phases 14-15 (shipped 2026-02-02)
|
||||||
- 🚧 **v2.0 Frontend** - Phases 16-21 (in progress)
|
- ✅ **v2.0 Frontend** - Phases 16-21 (shipped 2026-02-05)
|
||||||
|
|
||||||
## Phases
|
## Phases
|
||||||
|
|
||||||
@@ -244,7 +244,7 @@ Plans:
|
|||||||
|
|
||||||
</details>
|
</details>
|
||||||
|
|
||||||
### 🚧 v2.0 Frontend (In Progress)
|
### ✅ v2.0 Frontend (SHIPPED 2026-02-05)
|
||||||
|
|
||||||
**Milestone Goal:** Build the web UI from v1.3 wireframes using React + Vite with real-time tRPC subscriptions
|
**Milestone Goal:** Build the web UI from v1.3 wireframes using React + Vite with real-time tRPC subscriptions
|
||||||
|
|
||||||
@@ -322,12 +322,12 @@ Plans:
|
|||||||
**Plans**: 6 plans
|
**Plans**: 6 plans
|
||||||
|
|
||||||
Plans:
|
Plans:
|
||||||
- [ ] 21-01: Error Boundary & Toast Notifications
|
- [x] 21-01: Error Boundary & Toast Notifications
|
||||||
- [ ] 21-02: Skeleton Loading States
|
- [x] 21-02: Skeleton Loading States
|
||||||
- [x] 21-03: Cross-Screen Navigation & Mobile Responsive
|
- [x] 21-03: Cross-Screen Navigation & Mobile Responsive
|
||||||
- [x] 21-04: Subscription Error Handling
|
- [x] 21-04: Subscription Error Handling
|
||||||
- [ ] 21-05: Code Splitting & Performance
|
- [x] 21-05: Code Splitting & Performance
|
||||||
- [ ] 21-06: Integration Smoke Test
|
- [x] 21-06: Integration Smoke Test
|
||||||
|
|
||||||
## Progress
|
## Progress
|
||||||
|
|
||||||
@@ -358,7 +358,7 @@ Phases execute in numeric order: 1 → 1.1 → 2 → 3 → 4 → 5 → 6 → 7
|
|||||||
| 18. Initiative Detail | v2.0 | 4/4 | Complete | 2026-02-04 |
|
| 18. Initiative Detail | v2.0 | 4/4 | Complete | 2026-02-04 |
|
||||||
| 19. Agent Inbox | v2.0 | 4/4 | Complete | 2026-02-04 |
|
| 19. Agent Inbox | v2.0 | 4/4 | Complete | 2026-02-04 |
|
||||||
| 20. Real-time Subscriptions | v2.0 | 2/2 | Complete | 2026-02-04 |
|
| 20. Real-time Subscriptions | v2.0 | 2/2 | Complete | 2026-02-04 |
|
||||||
| 21. Polish & Integration | v2.0 | 4/6 | In progress | - |
|
| 21. Polish & Integration | v2.0 | 6/6 | Complete | 2026-02-05 |
|
||||||
|
|
||||||
---
|
---
|
||||||
*Roadmap created: 2026-01-30*
|
*Roadmap created: 2026-01-30*
|
||||||
@@ -366,3 +366,4 @@ Phases execute in numeric order: 1 → 1.1 → 2 → 3 → 4 → 5 → 6 → 7
|
|||||||
*v1.1 shipped: 2026-01-31 (8 plans, 3 phases)*
|
*v1.1 shipped: 2026-01-31 (8 plans, 3 phases)*
|
||||||
*v1.2 shipped: 2026-02-02 (21 plans, 4 phases)*
|
*v1.2 shipped: 2026-02-02 (21 plans, 4 phases)*
|
||||||
*v1.3 shipped: 2026-02-02 (11 plans, 2 phases)*
|
*v1.3 shipped: 2026-02-02 (11 plans, 2 phases)*
|
||||||
|
*v2.0 shipped: 2026-02-05 (27 plans, 6 phases)*
|
||||||
|
|||||||
@@ -9,19 +9,19 @@ See: .planning/PROJECT.md (updated 2026-02-04)
|
|||||||
|
|
||||||
## Current Position
|
## Current Position
|
||||||
|
|
||||||
Phase: 21 of 21 (Polish & Integration) - In progress
|
Phase: 21 of 21 (Polish & Integration) - Phase complete
|
||||||
Plan: 5 of 6 in current phase
|
Plan: 6 of 6 in current phase
|
||||||
Status: Completed 21-05 (Code Splitting & Data-Fetching Performance)
|
Status: Completed 21-06 (Integration Smoke Test)
|
||||||
Last activity: 2026-02-05 - Completed 21-05-PLAN.md (route code splitting + PlanTasksFetcher fix)
|
Last activity: 2026-02-05 - Completed 21-06-PLAN.md (full build verification + human smoke test)
|
||||||
|
|
||||||
Progress: █████████░ 99%
|
Progress: ██████████ 100%
|
||||||
|
|
||||||
## Performance Metrics
|
## Performance Metrics
|
||||||
|
|
||||||
**Velocity:**
|
**Velocity:**
|
||||||
- Total plans completed: 74
|
- Total plans completed: 75
|
||||||
- Average duration: 3 min
|
- Average duration: 3 min
|
||||||
- Total execution time: 209 min
|
- Total execution time: 211 min
|
||||||
|
|
||||||
**By Phase (v1.0):**
|
**By Phase (v1.0):**
|
||||||
|
|
||||||
@@ -249,6 +249,7 @@ Recent decisions affecting current work:
|
|||||||
- 21-04: SpawnArchitectDropdown already covered by 21-01 — verification task was no-op
|
- 21-04: SpawnArchitectDropdown already covered by 21-01 — verification task was no-op
|
||||||
- 21-05: autoCodeSplitting: true on TanStackRouterVite plugin — automatic route splitting without manual .lazy.tsx files
|
- 21-05: autoCodeSplitting: true on TanStackRouterVite plugin — automatic route splitting without manual .lazy.tsx files
|
||||||
- 21-05: PlanTasksFetcher onTasks moved to useEffect to prevent setState-during-render loops
|
- 21-05: PlanTasksFetcher onTasks moved to useEffect to prevent setState-during-render loops
|
||||||
|
- 21-06: No code changes needed — verification-only plan confirming all Phase 21 work integrates correctly
|
||||||
|
|
||||||
### Pending Todos
|
### Pending Todos
|
||||||
|
|
||||||
@@ -271,5 +272,5 @@ None.
|
|||||||
## Session Continuity
|
## Session Continuity
|
||||||
|
|
||||||
Last session: 2026-02-05
|
Last session: 2026-02-05
|
||||||
Stopped at: Completed 21-05 (Code Splitting & Data-Fetching Performance)
|
Stopped at: Completed 21-06 (Integration Smoke Test) - Phase 21 complete, v2.0 milestone complete
|
||||||
Resume file: None
|
Resume file: None
|
||||||
|
|||||||
90
.planning/phases/21-polish-integration/21-06-SUMMARY.md
Normal file
90
.planning/phases/21-polish-integration/21-06-SUMMARY.md
Normal file
@@ -0,0 +1,90 @@
|
|||||||
|
---
|
||||||
|
phase: 21-polish-integration
|
||||||
|
plan: 06
|
||||||
|
subsystem: ui
|
||||||
|
tags: [integration-test, smoke-test, verification, frontend]
|
||||||
|
|
||||||
|
# Dependency graph
|
||||||
|
requires:
|
||||||
|
- phase: 21-04
|
||||||
|
provides: Subscription error handling with toast notifications
|
||||||
|
- phase: 21-05
|
||||||
|
provides: Code splitting, PlanTasksFetcher render fix
|
||||||
|
provides:
|
||||||
|
- Verified frontend ready to ship as v2.0
|
||||||
|
- Full build pipeline confirmed (TypeScript, Vite, tests)
|
||||||
|
- Human-verified all screens, navigation, error handling, and loading states
|
||||||
|
affects: []
|
||||||
|
|
||||||
|
# Tech tracking
|
||||||
|
tech-stack:
|
||||||
|
added: []
|
||||||
|
patterns: []
|
||||||
|
|
||||||
|
key-files:
|
||||||
|
created: []
|
||||||
|
modified: []
|
||||||
|
|
||||||
|
key-decisions:
|
||||||
|
- "No code changes needed — verification-only plan confirming all Phase 21 work integrates correctly"
|
||||||
|
|
||||||
|
patterns-established: []
|
||||||
|
|
||||||
|
# Metrics
|
||||||
|
duration: 2min
|
||||||
|
completed: 2026-02-05
|
||||||
|
---
|
||||||
|
|
||||||
|
# Phase 21 Plan 06: Integration Smoke Test Summary
|
||||||
|
|
||||||
|
**Full build pipeline and human-verified end-to-end smoke test confirming v2.0 frontend readiness**
|
||||||
|
|
||||||
|
## Performance
|
||||||
|
|
||||||
|
- **Duration:** 2 min
|
||||||
|
- **Started:** 2026-02-05
|
||||||
|
- **Completed:** 2026-02-05
|
||||||
|
- **Tasks:** 2
|
||||||
|
- **Files modified:** 0
|
||||||
|
|
||||||
|
## Accomplishments
|
||||||
|
- Full build verification passed: TypeScript (backend + frontend), Vite production build, all tests green
|
||||||
|
- No `console.error` calls remaining in component source files
|
||||||
|
- Human smoke test approved: dashboard, detail, inbox, error handling, 404, loading states, and navigation all verified end-to-end
|
||||||
|
|
||||||
|
## Task Commits
|
||||||
|
|
||||||
|
This was a verification-only plan with no code changes:
|
||||||
|
|
||||||
|
1. **Task 1: Run full build verification** - (no commit - verification only)
|
||||||
|
2. **Task 2: Full integration smoke test** - (no commit - human-verify checkpoint, approved)
|
||||||
|
|
||||||
|
**Plan metadata:** committed with SUMMARY + STATE + ROADMAP update
|
||||||
|
|
||||||
|
## Files Created/Modified
|
||||||
|
None - verification-only plan.
|
||||||
|
|
||||||
|
## Decisions Made
|
||||||
|
None - followed plan as specified. All prior Phase 21 work verified as correct.
|
||||||
|
|
||||||
|
## Deviations from Plan
|
||||||
|
|
||||||
|
None - plan executed exactly as written.
|
||||||
|
|
||||||
|
## Issues Encountered
|
||||||
|
None
|
||||||
|
|
||||||
|
## User Setup Required
|
||||||
|
None - no external service configuration required.
|
||||||
|
|
||||||
|
## Next Phase Readiness
|
||||||
|
- Phase 21 complete. All 6 plans finished.
|
||||||
|
- v2.0 Frontend milestone ready to ship.
|
||||||
|
- All screens verified: dashboard, initiative detail, agent inbox, 404
|
||||||
|
- Error handling confirmed: toast notifications, persistent SSE disconnect warning, graceful degradation
|
||||||
|
- Loading states confirmed: skeleton loading cards, rows, and layout
|
||||||
|
- Navigation confirmed: cross-screen links, mobile responsive drill-down, back buttons
|
||||||
|
|
||||||
|
---
|
||||||
|
*Phase: 21-polish-integration*
|
||||||
|
*Completed: 2026-02-05*
|
||||||
Reference in New Issue
Block a user