docs(18-02): create plan summary and update project state
Add 18-02-SUMMARY.md with task commits, decisions, and metrics. Update STATE.md position to plan 2 of 4 in phase 18.
This commit is contained in:
@@ -203,6 +203,9 @@ Recent decisions affecting current work:
|
||||
- 17-04: Route param is $id matching existing $id.tsx file route definition
|
||||
- 18-01: Reuse SerializedInitiative shape for header props (dates as ISO strings)
|
||||
- 18-01: Actions button disabled as placeholder — wired in Plan 04
|
||||
- 18-02: SerializedTask type defined in TaskRow (same Date-to-string serialization pattern as SerializedInitiative)
|
||||
- 18-02: Phase hierarchy flattened — Plan layer hidden per decision 15-02, tasks rendered directly under phase
|
||||
- 18-02: Underscore prefix for unused type prop in DependencyIndicator (_type) to satisfy noUnusedParameters
|
||||
|
||||
### Pending Todos
|
||||
|
||||
@@ -225,5 +228,5 @@ None.
|
||||
## Session Continuity
|
||||
|
||||
Last session: 2026-02-04
|
||||
Stopped at: Completed 18-01-PLAN.md
|
||||
Stopped at: Completed 18-02-PLAN.md
|
||||
Resume file: None
|
||||
|
||||
97
.planning/phases/18-initiative-detail/18-02-SUMMARY.md
Normal file
97
.planning/phases/18-initiative-detail/18-02-SUMMARY.md
Normal file
@@ -0,0 +1,97 @@
|
||||
---
|
||||
phase: 18-initiative-detail
|
||||
plan: 02
|
||||
subsystem: ui
|
||||
tags: [react, tailwind, lucide-react, tree-view]
|
||||
|
||||
# Dependency graph
|
||||
requires:
|
||||
- phase: 17-initiative-dashboard
|
||||
provides: StatusBadge component
|
||||
- plan: 18-01
|
||||
provides: component patterns, SerializedInitiative type
|
||||
provides:
|
||||
- DependencyIndicator component for blocked-by annotations
|
||||
- TaskRow component with tree connectors and status
|
||||
- PhaseAccordion expandable phase container with task list
|
||||
affects: [18-04 page assembly, initiative detail page]
|
||||
|
||||
# Tech tracking
|
||||
tech-stack:
|
||||
added: []
|
||||
patterns: [tree-view with Unicode connectors, accordion with useState]
|
||||
|
||||
key-files:
|
||||
created:
|
||||
- packages/web/src/components/DependencyIndicator.tsx
|
||||
- packages/web/src/components/TaskRow.tsx
|
||||
- packages/web/src/components/PhaseAccordion.tsx
|
||||
modified: []
|
||||
|
||||
key-decisions:
|
||||
- "18-02: SerializedTask type defined in TaskRow (same Date-to-string serialization pattern as SerializedInitiative)"
|
||||
- "18-02: Phase hierarchy flattened — Plan layer hidden per decision 15-02, tasks rendered directly under phase"
|
||||
- "18-02: Underscore prefix for unused type prop in DependencyIndicator (_type) to satisfy noUnusedParameters"
|
||||
|
||||
patterns-established:
|
||||
- "Tree connector pattern: Unicode ├── / └── with border-l for visual continuity"
|
||||
- "Accordion pattern: useState toggle with ChevronDown/ChevronRight icons"
|
||||
|
||||
# Metrics
|
||||
duration: 4min
|
||||
completed: 2026-02-04
|
||||
---
|
||||
|
||||
# Phase 18 Plan 02: PhaseAccordion, TaskRow & DependencyIndicator Summary
|
||||
|
||||
**Three interconnected components for the initiative detail hierarchy view: expandable phase containers, task rows with tree connectors, and dependency annotations**
|
||||
|
||||
## Performance
|
||||
|
||||
- **Duration:** 4 min
|
||||
- **Started:** 2026-02-04
|
||||
- **Completed:** 2026-02-04
|
||||
- **Tasks:** 3
|
||||
- **Files modified:** 3
|
||||
|
||||
## Accomplishments
|
||||
- DependencyIndicator: pure presentational component rendering `^ blocked by: name1, name2` in amber text, returns null when empty
|
||||
- TaskRow: task row with Unicode tree connectors (├── / └──), StatusBadge, inline agent name in blue, DependencyIndicator for blocked tasks, clickable with hover feedback
|
||||
- PhaseAccordion: expandable/collapsible phase container with ChevronDown/ChevronRight toggle, phase number + name header, task count (completed/total), StatusBadge, phase-level DependencyIndicator, and TaskRow list when expanded
|
||||
- All components are presentational — data assembly handled by parent page
|
||||
|
||||
## Task Commits
|
||||
|
||||
Each task was committed atomically:
|
||||
|
||||
1. **Task 1: Create DependencyIndicator component** - `a00b7b5` (feat)
|
||||
2. **Task 2: Create TaskRow component** - `4becfe8` (feat)
|
||||
3. **Task 3: Create PhaseAccordion component** - `92d4d36` (feat)
|
||||
|
||||
## Files Created/Modified
|
||||
- `packages/web/src/components/DependencyIndicator.tsx` - Blocked-by annotation with ^ prefix in amber text
|
||||
- `packages/web/src/components/TaskRow.tsx` - Task row with tree connectors, status badge, agent name, dependency indicator
|
||||
- `packages/web/src/components/PhaseAccordion.tsx` - Expandable phase container with chevron toggle, task count, status, task list
|
||||
|
||||
## Decisions Made
|
||||
- 18-02: SerializedTask type defined in TaskRow (same Date-to-string serialization pattern as SerializedInitiative)
|
||||
- 18-02: Phase hierarchy flattened — Plan layer hidden per decision 15-02, tasks rendered directly under phase
|
||||
- 18-02: Underscore prefix for unused type prop in DependencyIndicator (_type) to satisfy noUnusedParameters
|
||||
|
||||
## Deviations from Plan
|
||||
|
||||
None - plan executed exactly as written.
|
||||
|
||||
## Issues Encountered
|
||||
None
|
||||
|
||||
## User Setup Required
|
||||
None - no external service configuration required.
|
||||
|
||||
## Next Phase Readiness
|
||||
- All three components ready for page assembly in Plan 04
|
||||
- Ready for 18-03-PLAN.md (DecisionList and remaining detail components)
|
||||
|
||||
---
|
||||
*Phase: 18-initiative-detail*
|
||||
*Completed: 2026-02-04*
|
||||
Reference in New Issue
Block a user