docs(01.1-05): complete server tests and events plan

Tasks completed: 2/2
- Write unit tests for CoordinationServer
- Add event emission to server and shutdown handler

SUMMARY: .planning/phases/01.1-hexagonal-architecture/01.1-05-SUMMARY.md
This commit is contained in:
Lukas May
2026-01-30 14:04:47 +01:00
parent 3b24cf2c9d
commit 63e603709d
3 changed files with 114 additions and 11 deletions

View File

@@ -50,8 +50,8 @@ Plans:
- [x] 01.1-01: Event Bus Foundation (Wave 1)
- [x] 01.1-02: tRPC Foundation (Wave 1)
- [ ] 01.1-03: Process Module Tests + Events (Wave 2)
- [ ] 01.1-04: Logging Module Tests + Events (Wave 2)
- [ ] 01.1-05: Server Module Tests + Events (Wave 2)
- [x] 01.1-04: Logging Module Tests + Events (Wave 2)
- [x] 01.1-05: Server Module Tests + Events (Wave 2)
- [ ] 01.1-06: CLI tRPC Integration (Wave 3)
**Scope:**
@@ -134,7 +134,7 @@ Phases execute in numeric order: 1 → 1.1 → 2 → 3 → 4 → 5 → 6 → 7
| Phase | Plans Complete | Status | Completed |
|-------|----------------|--------|-----------|
| 1. Core Infrastructure | 5/5 | Complete | 2026-01-30 |
| 1.1. Hexagonal Architecture | 2/6 | In progress | - |
| 1.1. Hexagonal Architecture | 3/6 | In progress | - |
| 2. Data Layer | 0/? | Not started | - |
| 3. Git Integration | 0/? | Not started | - |
| 4. Agent Lifecycle | 0/? | Not started | - |

View File

@@ -10,28 +10,28 @@ See: .planning/PROJECT.md (updated 2026-01-30)
## Current Position
Phase: 1.1 of 8 (Hexagonal Architecture - INSERTED)
Plan: 2 of 6 in current phase
Plan: 5 of 6 in current phase
Status: In progress
Last activity: 2026-01-30 — Completed 01.1-02-PLAN.md
Last activity: 2026-01-30 — Completed 01.1-05-PLAN.md
Progress: ██████████░ 77%
Progress: █████████████░ 92%
## Performance Metrics
**Velocity:**
- Total plans completed: 7
- Total plans completed: 8
- Average duration: 3 min
- Total execution time: 24 min
- Total execution time: 26 min
**By Phase:**
| Phase | Plans | Total | Avg/Plan |
|-------|-------|-------|----------|
| 1 | 5/5 | 15 min | 3 min |
| 1.1 | 2/6 | 9 min | 5 min |
| 1.1 | 3/6 | 11 min | 4 min |
**Recent Trend:**
- Last 5 plans: 01-03 (0 min), 01-04 (5 min), 01-05 (7 min), 01.1-01 (3 min), 01.1-02 (6 min)
- Last 5 plans: 01-04 (5 min), 01-05 (7 min), 01.1-01 (3 min), 01.1-02 (6 min), 01.1-05 (2 min)
- Trend: Steady
## Accumulated Context
@@ -47,6 +47,8 @@ Recent decisions affecting current work:
- 01-05: Used node:http instead of Express for minimal server footprint
- 01.1-01: EventBus is PORT, EventEmitterBus is ADAPTER for swappability
- 01.1-02: Zod for output validation, procedures match HTTP endpoint shapes
- 01.1-04: EventBus is optional parameter for backwards compatibility in logging
- 01.1-05: Optional eventBus injection for server lifecycle events
### Pending Todos
@@ -65,5 +67,5 @@ None yet.
## Session Continuity
Last session: 2026-01-30
Stopped at: Completed 01.1-02-PLAN.md (tRPC Foundation)
Stopped at: Completed 01.1-05-PLAN.md (Server Tests and Events)
Resume file: None

View File

@@ -0,0 +1,101 @@
---
phase: 01.1-hexagonal-architecture
plan: 05
subsystem: server
tags: [vitest, events, eventbus, server, shutdown, lifecycle, testing]
# Dependency graph
requires:
- phase: 01.1-01
provides: EventBus port interface and domain events (ServerStartedEvent, ServerStoppedEvent)
provides:
- Comprehensive CoordinationServer test coverage
- Server lifecycle event emission
- GracefulShutdown test coverage
affects: [01.1-06]
# Tech tracking
tech-stack:
added: []
patterns: [event-driven-lifecycle, optional-dependency-injection]
key-files:
created:
- src/server/index.test.ts
- src/server/shutdown.test.ts
modified:
- src/server/index.ts
key-decisions:
- "EventBus is optional parameter for backwards compatibility"
- "Events emitted before console.log in start(), before close in stop()"
- "Signal handler tests verify listener count increase rather than triggering signals"
patterns-established:
- "Optional eventBus injection pattern for lifecycle events"
- "Mock creation helper functions for consistent test setup"
# Metrics
duration: 2min
completed: 2026-01-30
---
# Phase 1.1 Plan 05: Server Tests and Events Summary
**Comprehensive server test coverage with lifecycle event emission through EventBus for reactive coordination patterns**
## Performance
- **Duration:** 2 min
- **Started:** 2026-01-30T13:01:10Z
- **Completed:** 2026-01-30T13:03:38Z
- **Tasks:** 2
- **Files modified:** 3
## Accomplishments
- Comprehensive unit tests for CoordinationServer (lifecycle, HTTP endpoints, PID file management)
- Server emits ServerStarted and ServerStopped events through optional EventBus
- GracefulShutdown test coverage for shutdown() method and signal handler installation
- 16 new server tests + 6 shutdown tests = 22 new tests total
## Task Commits
Each task was committed atomically:
1. **Task 1: Write unit tests for CoordinationServer** - `ea79b3b` (test)
2. **Task 2: Add event emission to server and shutdown handler** - `1f255ee` (feat)
## Files Created/Modified
- `src/server/index.test.ts` - CoordinationServer lifecycle, HTTP endpoint, PID file, and event emission tests
- `src/server/shutdown.test.ts` - GracefulShutdown shutdown() and install() tests
- `src/server/index.ts` - Added optional eventBus parameter, emit ServerStarted/ServerStopped events
## Decisions Made
1. **EventBus as optional parameter** - Maintains backwards compatibility while enabling event-driven patterns
2. **Events emitted at specific lifecycle points** - ServerStarted after PID file written, ServerStopped before closing connections
3. **Signal handler tests use listener count** - Safer than triggering actual signals which could affect test runner
## Deviations from Plan
None - plan executed exactly as written.
## Issues Encountered
None
## User Setup Required
None - no external service configuration required.
## Next Phase Readiness
- Server module fully tested with event emission
- Event-driven lifecycle enables reactive patterns (dashboard updates, coordination)
- Ready for 01.1-06: Final integration and phase completion
---
*Phase: 01.1-hexagonal-architecture*
*Completed: 2026-01-30*