Files
Codewalkers/.planning/phases/18-initiative-detail/18-02-SUMMARY.md
Lukas May 2b6c58aae7 docs(18-02): create plan summary and update project state
Add 18-02-SUMMARY.md with task commits, decisions, and metrics.
Update STATE.md position to plan 2 of 4 in phase 18.
2026-02-04 21:34:24 +01:00

3.8 KiB

phase, plan, subsystem, tags, requires, provides, affects, tech-stack, key-files, key-decisions, patterns-established, duration, completed
phase plan subsystem tags requires provides affects tech-stack key-files key-decisions patterns-established duration completed
18-initiative-detail 02 ui
react
tailwind
lucide-react
tree-view
phase provides
17-initiative-dashboard StatusBadge component
plan provides
18-01 component patterns, SerializedInitiative type
DependencyIndicator component for blocked-by annotations
TaskRow component with tree connectors and status
PhaseAccordion expandable phase container with task list
18-04 page assembly
initiative detail page
added patterns
tree-view with Unicode connectors
accordion with useState
created modified
packages/web/src/components/DependencyIndicator.tsx
packages/web/src/components/TaskRow.tsx
packages/web/src/components/PhaseAccordion.tsx
18-02: SerializedTask type defined in TaskRow (same Date-to-string serialization pattern as SerializedInitiative)
18-02: Phase hierarchy flattened — Plan layer hidden per decision 15-02, tasks rendered directly under phase
18-02: Underscore prefix for unused type prop in DependencyIndicator (_type) to satisfy noUnusedParameters
Tree connector pattern: Unicode ├── / └── with border-l for visual continuity
Accordion pattern: useState toggle with ChevronDown/ChevronRight icons
4min 2026-02-04

Phase 18 Plan 02: PhaseAccordion, TaskRow & DependencyIndicator Summary

Three interconnected components for the initiative detail hierarchy view: expandable phase containers, task rows with tree connectors, and dependency annotations

Performance

  • Duration: 4 min
  • Started: 2026-02-04
  • Completed: 2026-02-04
  • Tasks: 3
  • Files modified: 3

Accomplishments

  • DependencyIndicator: pure presentational component rendering ^ blocked by: name1, name2 in amber text, returns null when empty
  • TaskRow: task row with Unicode tree connectors (├── / └──), StatusBadge, inline agent name in blue, DependencyIndicator for blocked tasks, clickable with hover feedback
  • PhaseAccordion: expandable/collapsible phase container with ChevronDown/ChevronRight toggle, phase number + name header, task count (completed/total), StatusBadge, phase-level DependencyIndicator, and TaskRow list when expanded
  • All components are presentational — data assembly handled by parent page

Task Commits

Each task was committed atomically:

  1. Task 1: Create DependencyIndicator component - a00b7b5 (feat)
  2. Task 2: Create TaskRow component - 4becfe8 (feat)
  3. Task 3: Create PhaseAccordion component - 92d4d36 (feat)

Files Created/Modified

  • packages/web/src/components/DependencyIndicator.tsx - Blocked-by annotation with ^ prefix in amber text
  • packages/web/src/components/TaskRow.tsx - Task row with tree connectors, status badge, agent name, dependency indicator
  • packages/web/src/components/PhaseAccordion.tsx - Expandable phase container with chevron toggle, task count, status, task list

Decisions Made

  • 18-02: SerializedTask type defined in TaskRow (same Date-to-string serialization pattern as SerializedInitiative)
  • 18-02: Phase hierarchy flattened — Plan layer hidden per decision 15-02, tasks rendered directly under phase
  • 18-02: Underscore prefix for unused type prop in DependencyIndicator (_type) to satisfy noUnusedParameters

Deviations from Plan

None - plan executed exactly as written.

Issues Encountered

None

User Setup Required

None - no external service configuration required.

Next Phase Readiness

  • All three components ready for page assembly in Plan 04
  • Ready for 18-03-PLAN.md (DecisionList and remaining detail components)

Phase: 18-initiative-detail Completed: 2026-02-04