Files
Codewalkers/.planning/phases/21-polish-integration/21-06-SUMMARY.md
Lukas May 111ed0962f docs(21-06): complete integration smoke test plan
Tasks completed: 2/2
- Run full build verification (TypeScript, Vite, tests)
- Full integration smoke test (human-verified, approved)

SUMMARY: .planning/phases/21-polish-integration/21-06-SUMMARY.md
2026-02-05 09:16:31 +01:00

2.5 KiB

phase, plan, subsystem, tags, requires, provides, affects, tech-stack, key-files, key-decisions, patterns-established, duration, completed
phase plan subsystem tags requires provides affects tech-stack key-files key-decisions patterns-established duration completed
21-polish-integration 06 ui
integration-test
smoke-test
verification
frontend
phase provides
21-04 Subscription error handling with toast notifications
phase provides
21-05 Code splitting, PlanTasksFetcher render fix
Verified frontend ready to ship as v2.0
Full build pipeline confirmed (TypeScript, Vite, tests)
Human-verified all screens, navigation, error handling, and loading states
added patterns
created modified
No code changes needed — verification-only plan confirming all Phase 21 work integrates correctly
2min 2026-02-05

Phase 21 Plan 06: Integration Smoke Test Summary

Full build pipeline and human-verified end-to-end smoke test confirming v2.0 frontend readiness

Performance

  • Duration: 2 min
  • Started: 2026-02-05
  • Completed: 2026-02-05
  • Tasks: 2
  • Files modified: 0

Accomplishments

  • Full build verification passed: TypeScript (backend + frontend), Vite production build, all tests green
  • No console.error calls remaining in component source files
  • Human smoke test approved: dashboard, detail, inbox, error handling, 404, loading states, and navigation all verified end-to-end

Task Commits

This was a verification-only plan with no code changes:

  1. Task 1: Run full build verification - (no commit - verification only)
  2. Task 2: Full integration smoke test - (no commit - human-verify checkpoint, approved)

Plan metadata: committed with SUMMARY + STATE + ROADMAP update

Files Created/Modified

None - verification-only plan.

Decisions Made

None - followed plan as specified. All prior Phase 21 work verified as correct.

Deviations from Plan

None - plan executed exactly as written.

Issues Encountered

None

User Setup Required

None - no external service configuration required.

Next Phase Readiness

  • Phase 21 complete. All 6 plans finished.
  • v2.0 Frontend milestone ready to ship.
  • All screens verified: dashboard, initiative detail, agent inbox, 404
  • Error handling confirmed: toast notifications, persistent SSE disconnect warning, graceful degradation
  • Loading states confirmed: skeleton loading cards, rows, and layout
  • Navigation confirmed: cross-screen links, mobile responsive drill-down, back buttons

Phase: 21-polish-integration Completed: 2026-02-05