Commit Graph

16 Commits

Author SHA1 Message Date
Lukas May
b70c07caf2 docs(03-01): complete git events and worktree port plan
Tasks completed: 2/2
- Add git domain events to event types
- Create WorktreeManager port interface

SUMMARY: .planning/phases/03-git-integration/03-01-SUMMARY.md
2026-01-30 19:25:21 +01:00
Lukas May
115866ccc6 docs(02): complete data layer phase 2026-01-30 19:14:06 +01:00
Lukas May
71b132a61e docs(02-02): complete repository layer plan
Tasks completed: 4/4
- Create repository port interfaces
- Create Drizzle repository adapters
- Write repository tests
- Update exports and test cascade deletes

SUMMARY: .planning/phases/02-data-layer/02-02-SUMMARY.md
2026-01-30 19:13:04 +01:00
Lukas May
5347d3e681 docs(02-01): complete SQLite database setup plan
Tasks completed: 3/3
- Install Drizzle ORM and SQLite dependencies
- Create database connection factory
- Define task hierarchy schema

SUMMARY: .planning/phases/02-data-layer/02-01-SUMMARY.md
2026-01-30 14:25:58 +01:00
Lukas May
7c2664cfb7 docs(01.1-06): complete CLI-tRPC integration plan
Tasks completed: 2/2
- Add tRPC HTTP adapter and CLI client
- Update CLI status command and add integration tests

SUMMARY: .planning/phases/01.1-hexagonal-architecture/01.1-06-SUMMARY.md
Phase 1.1 complete: 131 tests, hexagonal architecture retrofitted
2026-01-30 14:10:36 +01:00
Lukas May
573a704230 docs(01.1-04): complete logging module tests and events plan
Tasks completed: 2/2
- Write unit tests for LogManager and ProcessLogWriter
- Add event emission to ProcessLogWriter

SUMMARY: .planning/phases/01.1-hexagonal-architecture/01.1-04-SUMMARY.md
2026-01-30 14:04:56 +01:00
Lukas May
63e603709d docs(01.1-05): complete server tests and events plan
Tasks completed: 2/2
- Write unit tests for CoordinationServer
- Add event emission to server and shutdown handler

SUMMARY: .planning/phases/01.1-hexagonal-architecture/01.1-05-SUMMARY.md
2026-01-30 14:04:47 +01:00
Lukas May
f2a7b3f77a docs(01.1-02): complete tRPC foundation plan
Tasks completed: 2/2
- Install tRPC dependencies and create router foundation
- Define procedures matching HTTP endpoints with tests

SUMMARY: .planning/phases/01.1-hexagonal-architecture/01.1-02-SUMMARY.md
2026-01-30 13:59:53 +01:00
Lukas May
e72ffdd800 docs(01.1-01): complete event bus foundation plan
Tasks completed: 3/3
- Install and configure Vitest test framework
- Create EventBus port interface and EventEmitter adapter
- Define domain events with typed payloads and tests

SUMMARY: .planning/phases/01.1-hexagonal-architecture/01.1-01-SUMMARY.md
2026-01-30 13:56:20 +01:00
Lukas May
655fc296b6 docs(01.1): update roadmap and state with plan details
- 6 plans in 3 waves documented
- Wave structure: parallel foundation → parallel refactors → integration
- Ready for execution
2026-01-30 13:50:10 +01:00
Lukas May
6f64ec3e8c docs(01-05): complete server mode plan
Tasks completed: 2/2
- HTTP server with health endpoint and PID file
- Graceful shutdown with signal handlers

SUMMARY: .planning/phases/01-core-infrastructure/01-05-SUMMARY.md

Phase 1 (Core Infrastructure) complete.
2026-01-30 13:28:15 +01:00
Lukas May
f117227fed docs(01-04): complete logging infrastructure plan
Tasks completed: 2/2
- Create log directory management
- Create per-process log writer

SUMMARY: .planning/phases/01-core-infrastructure/01-04-SUMMARY.md
2026-01-30 13:18:17 +01:00
Lukas May
57a4d938fa docs(01-02): complete CLI entry point plan
Tasks completed: 2/2
- Create CLI with commander
- Enable global installation via npm link

SUMMARY: .planning/phases/01-core-infrastructure/01-02-SUMMARY.md
2026-01-30 13:14:28 +01:00
Lukas May
5329349878 docs(01-01): complete project foundation plan
Tasks completed: 2/2
- Initialize Node.js project with TypeScript and ESM
- Create source structure and entry point

SUMMARY: .planning/phases/01-core-infrastructure/01-01-SUMMARY.md
2026-01-30 13:11:19 +01:00
Lukas May
074f79b855 docs(01): create phase 1 plan
Phase 01: Core Infrastructure
- 5 plans in 3 waves
- Wave 1: Project foundation (01-01)
- Wave 2: CLI, process mgmt, logging (01-02, 01-03, 01-04) [parallel]
- Wave 3: Server mode & shutdown (01-05)
- Ready for execution
2026-01-30 13:06:38 +01:00
Lukas May
a315b286fd docs: create roadmap (7 phases, 27 requirements)
Multi-agent workspace for orchestrating Claude Code agents.

Phases:
1. Core Infrastructure: INFRA-01 through INFRA-05
2. Data Layer: TASK-02, TASK-03
3. Git Integration: GIT-01 through GIT-04
4. Agent Lifecycle: AGENT-01 through AGENT-07 (except AGENT-06)
5. Task Dispatch: AGENT-06, TASK-01, TASK-04, TASK-05
6. Coordination: COORD-01, COORD-02
7. File System UI: FSUI-01 through FSUI-04

All v1 requirements mapped to phases.
2026-01-30 12:55:55 +01:00